Wednesday 30 November 2016

LANDJUT 2017 - Terrain WIP (3)

Embankment sections painted and flocked. Ballast added to track sections. Bridge undercoated and ready for detailed painting. Apart from a bit of detailing and finishing off the 6ft of embankments are pretty much ready to take to the table. I will hopefully get a set up done in the next week or two to show the bridge, embankment and canal all set up.

Embankment painted, drybrushed, flocked and ballast added to track

Underpass nearly complete, just a bit more painting and the road section added.

Close up of the ballast.




2 comments:

  1. Excellent. Really great terrain item, should be a great focal point for the table.

    Cheers, Andy

    ReplyDelete
  2. Yet more fantastic terrain Richard, inspirational stuff.
    Cheers
    Steve

    ReplyDelete